tue, 24 nov --:--:--
USD 0 0
EUR 0 0
А9582.64 ДТ93.04
+17° Одеса

Ми — ваша газета

Novoshchepnoy Ryad: Reconstruction Continues

Novoschepnoy Ryad street is being radically transformed, and upon completion of all work, it is destined to become one of the most important elements of the “North-South” project, which envisages the creation of a single 32-kilometer tram route connecting the Kotovsky and Tairova residential areas.

According to the plan, the first stage of reconstruction, which should be completed in mid-January next year, included the repair of the section from Preobrazhenskaya Street to Ekaterininskaya Street. The second stage – from January to July 2021 – included work from Ekaterininskaya Street to the exit from the “Starosennaya” bus station to Vodoprovodnaya Street.

Work continues
Work continues

However, “Rostdorstroy,” the company engaged in the capital repair of Novoschepnoy Ryad, decided to carry out reconstruction on two sections at once. The road surface has already been completely replaced with the laying of new underground utilities and a new road base. New tram tracks have been laid on a dedicated lane, with waterproofing and drainage systems, and new contact network poles have been installed. Importantly, comprehensive landscaping of the adjacent territory has been carried out. Two bus stop complexes have already been equipped, and on most of Novoschepnoy Ryad, the sidewalk has been paved with tiles.

Leave a Reply

Your email address will not be published. Required fields are marked *

Загрузка…

Мітки

Наша галерея

Вечірня Одеса