At the beginning of the year, World Bank experts presented preliminary results of an almost year-long study of the state of Odessa’s transport infrastructure (we reported on this in the issue of February 13 of this year), promising to present final conclusions later.
Today, we will discuss the World Bank’s recommendations for reforming urban public transport. According to expert estimates, this will cost the city a total of 64 to 625 million dollars, depending on which option for reorganizing the transport system the city administration chooses.
Three Stages of Reform
The main condition, according to World Bank experts, is the reform of management and the creation of an integrated public transport system. Moreover, this process can be carried out in three stages. At the first, short-term stage, it is proposed to grant local self-government and its structures the status of an integrated transport authority with rather broad powers, including the optimization of transport types.
In particular, World Bank experts propose to retain the three largest carriers, who will be given a strict condition to gradually replace their rolling stock with large-capacity buses, as well as to implement quality standards for passenger transportation.
Among other recommendations are the introduction of an electronic ticket, equipping transport with a GPS monitoring system, strict control over passenger transportation, etc.
Among other measures, significant investments in transport-related infrastructure are envisaged. This includes the renovation of 600 stops, which will require $6 million, the installation of electronic displays at 30 stops ($3 million), the construction of 60 km of dedicated lanes for public transport ($2 million), the reorganization of 15 intersections, and the unloading of traffic on Panteleimonovskaya and Preobrazhenskaya streets.
At the second, medium-term stage, carriers should transition from large-capacity buses to low-floor buses equipped with all modern technologies. At the same time, it is proposed to introduce weighted average prices for all types of public transport – buses, trams, and trolleybuses. This stage also includes the organization of 15 transfer hubs – 9 main and 6 auxiliary, which will require $7 million.
At the third, long-term stage, the city must decide on the financing options for transportation. Either the city will pay the carrier’s services from the city budget (regardless of ownership) – based on mileage, number and regularity of routes – and take on the risks of revenue collection and provision of benefits, or private carriers will receive all rights to the routes along with all financial risks (except for social routes).
KP “OGET” May Become the Largest Carrier
According to World Bank experts, optimization of the route network is needed at all three stages of the reform. First of all, it is necessary to eliminate overlapping routes and thus eliminate competition for urban electric transport from minibuses. Out of the current 91 routes (buses, trams, and trolleybuses), experts recommend keeping 73, eliminating 25 “similar” routes, changing 16, and adding five.
In particular, World Bank experts propose to create two new trolleybus routes. One of them will connect Zastava-1 – via Richter, Akademik Filatov, Admiral’skiy Prospekt, Chernyakhovskiy, and Genuezskaya streets – to Arcadia. The second will run from Inglessi Street along Kosmonavtov, Akademik Filatov, Richter, Melnitskaya, Bogdan Khmelnitsky, and Malaya Arnautskaya streets (with a stop at the train station) to Shevchenko Park.
Three new bus routes are also recommended: from Lanzheron through Shevchenko Prospekt and Fontan to the Tairova residential area; from Dacha Kovalevskogo to the Selection Institute via Akademik Korolev and Inglessi streets; and also to connect the center of Odessa through Moldavanka, Balkovskaya Street, Malinovskogo Street with the Tairova residential area.
It is proposed to increase the number of rolling stock and reduce the headway on the most popular trolleybus routes №№ 3, 7, and 12.
KP “Odesgorelektrotrans” is recommended to take over seven of the busiest bus routes, equipping them with 12-meter-long large-capacity buses, which will require at least 223 buses. After this, KP “OGET” will become the largest carrier in the city.
According to World Bank experts, the “North-South” tram line should become the basis of the city’s route network in the future, from which additional routes will be launched to Arcadia, Fontan, and Itzhaka Rabina Street (Cheryomushki). It is also proposed to build a new 5.5 km tram line along Dnepropetrovskaya Road (Semyona Paliya Street).
The Key to Success is Modernization
World Bank experts consider the renewal of the urban electric transport rolling stock an indispensable condition for the reorganization of the transport system. Thus, it is proposed to modernize 206 old “Tatra” trams, which will cost KP “OGET” $30,000 for each. And then, at the second and third stages of reform, to replenish the tram fleet with new low-floor trams, spending 100 million euros on their acquisition.
It is proposed to start the renewal of tram tracks with the reconstruction of the line towards the Kotovskiy residential area, which will allow the launch of the “North-South” high-speed tram line with further branches towards Fontan, Arcadia, and Cheryomushki. The complete renewal of the tram infrastructure will require up to $400 million, including $25 million for the construction of a 5.5-kilometer line along Semyona Paliya Street.
As for trolleybus lines, according to World Bank experts, it is necessary to purchase new low-floor vehicles to replace 128 old trolleybuses, which will cost almost $20 million, and also to purchase an additional 7 new trolleybuses for $1 million. As a result, the OGET trolleybus fleet will consist of almost 200 vehicles, which is almost twice as many as there are today.
The World Bank is betting on the leading position of KP “Odesgorelektrotrans” as the main city carrier and recommends that it purchase 223 buses, which, as mentioned earlier, will allow it to take a leading position in bus transportation. The company will need over $26 million to purchase diesel buses, and if preference is given to electric buses, then $55.7 million.
The City is Taking the First Steps
The reform proposed to Odessa by the World Bank will cost the city treasury approximately $625 million. The third stage of reform will be the most expensive due to the modernization of tram tracks and the purchase of trams – $525 million, which is two annual city budgets. Experts say that if the transport reform is stretched over 10 years, the city will be able to afford these expenses. Moreover, obtaining loans from the European Investment Bank (recall that last week the executive committee of the Odessa City Council already authorized the receipt of a $50 million loan from the EIB) makes the reform of urban transport quite realistic.
And the first steps in this direction are already being taken – KP “OGET” is not only acquiring low-floor trolleybuses but also producing its own modern trams, and soon the first Odessa electric bus will be put into operation… And the “North-South” high-speed tram line will soon become a reality rather than a future prospect…