In connection with the outbreak of rotavirus infection in Izmail, the “Infoksvodokanal” branch informs the residents of Odesa that, as of today, the tap water supplied to consumers from the “Dnister” Water Treatment Plant fully complies with the current sanitary norms and requirements of SanPiN 2.2.4-171-10 for drinking water.
Before being supplied to Odesa, the water undergoes thorough multi-stage purification and disinfection at the “Dnister” Water Treatment Plant, where rapid filters are replaced and equipment is modernized in a timely manner. After this, already in Odesa, the water is additionally disinfected at all city water pumping stations, which “Infoksvodokanal” has switched to a new, safe technology for water disinfection with sodium hypochlorite. For this purpose, the enterprise has invested more than 5 million hryvnias in German and Austrian equipment and the highest quality reagents.
In addition, the quality of tap water in Odesa is always monitored around the clock in the modernized central chemical and bacteriological laboratory of the “Infoksvodokanal” branch and the laboratory at the “Dnister” Water Treatment Plant. For this purpose, water samples are collected daily from more than a hundred points across all districts of the city. Studies are conducted by highly qualified specialists on modern equipment for more than 50 indicators. The microbiological safety of drinking water is determined by indicators that, with a sufficiently high probability, characterize the absence of harmful biological components for human health. Studies of the chemical composition of drinking water allow for the determination of water safety in terms of toxic, carcinogenic, and mutagenic substances of organic and inorganic nature.
Moreover, laboratory staff of the “Infoksvodokanal” branch constantly send water samples for virological studies to the laboratory of the state institution “Odesa Laboratory Center of the State Sanitary and Epidemiological Service of Ukraine.”
As of today, the most significant threat to the reliability of water supply is untimely payments for water. As of June 21, more than 50% of Odesa residents (!) have not paid for the water consumed in May. And the total debt of the population for water use services has exceeded 130 million UAH.
Subscribers, unfortunately, do not consider that the water utility, in order to provide uninterrupted and high-quality water supply services, must pay for electricity on time (more than 20 million UAH per month), purchase fuel and lubricants, and reagents for water purification. And in the conditions of summer heat, all purchases must be made in advance, as water consumption increases significantly.
Therefore, “Infoksvodokanal” appeals to all its subscribers with a request to pay all charges for consumed services and settle accumulated debts by June 29. This will help specialists supply water 24 hours a day and ensure its quality.











