tue, 24 nov --:--:--
USD 0 0
EUR 0 0
А9582.64 ДТ93.04
+17° Одеса

Ми — ваша газета

The winner of the Black Sea shelf development tender has been determined

As reported by the Department of Information and Public Communications of the Secretariat of the Cabinet of Ministers, the intergovernmental commission has determined the winner of the tender for hydrocarbon extraction within the Skifska area (Black Sea shelf) in accordance with Resolution of the Cabinet of Ministers of Ukraine dated 23.05.2012 No. 455 “On conducting a tender for the conclusion of a hydrocarbon production sharing agreement within the Skifska area”. The winner is ExxonMobil Exploration B.V. This was announced by the Minister of Ecology and Natural Resources, Eduard Stavytsky, during a briefing at the Government House.

He recalled that the tender applications were submitted by the State Service of Geology and Subsoil of Ukraine to the Cabinet of Ministers on August 3, 2012. He also mentioned that two applications were received from Lukoil Overseas Ukraine B.V. and ExxonMobil Exploration B.V. The second application is a joint one and includes proposals from ExxonMobil, Shell, Petron (a subsidiary of OMV), and NJSC “Nadra of Ukraine”. Eduard Stavytsky noted that ExxonMobil won the tender because it was able to offer more favorable terms.
“The winners offered twice as much for exploration work as stipulated by the tender conditions for geological exploration across the entire territory. After the conclusion of the production sharing agreement, which will take place this year, the state budget will receive $325 million, which is more than was anticipated under the tender conditions. The winners also offered a larger share of profitable production to the state. The minimum share was 20%, and 25% was offered,” noted Eduard Stavytsky.
We remind you that according to the tender conditions, the minimum amount of the special payment (bonus) to the state budget, paid by the investor within 10 days after signing the production sharing agreement (PSA) for hydrocarbons to be extracted within the Skifska area of the Black Sea shelf, was set at UAH 2.4 billion. The minimum investment volume in the first stage of geological exploration (which should be completed within five years) must be at least UAH 1.6 billion. In the second stage, pilot production, the total investment volume required, in particular for industrial development, was determined by the tender conditions. As Eduard Stavytsky stated, the area of the Skifska site is 16,698 thousand sq.m, with a production potential of up to 5 billion cubic meters of gas annually; in total, specialists estimate the reserves of the area at 200-250 billion cubic meters of fuel.
The maximum share of compensation production, by which the investor’s expenses will be reimbursed, is set at 70%, and the state’s share in profitable production must be at least 20%. The PSA will be concluded for 50 years.
The Minister also reported that each company purchased tender documentation for the Skifska area for UAH 12 million to participate in the tender, and also paid UAH 1 million for participation in the tender.
Finally, the head of the environmental agency noted that by implementing all the projects currently proposed by the state for increasing hydrocarbon production, Ukraine can reach a gas production of about 45 billion cubic meters by 2020, which, along with the use of energy-saving technologies, will allow the country to fully provide itself with hydrocarbons.
“Increasing domestic production and the state’s participation in production sharing will allow us to adjust prices in the domestic market. I am confident that we will achieve this goal,” concluded Eduard Stavytsky.

Leave a Reply

Your email address will not be published. Required fields are marked *

Загрузка…

Мітки

Наша галерея

Вечірня Одеса