From June 1st, reports KP “Odessgoretlektrotrans”, for a period of 1 month, with possible subsequent extension of terms, tram route No. 4 “Arkadia — Shevchenko Park” will start operating.
2 units of rolling stock will operate on the route with a headway of 23-24 minutes.
Start of movement — 12:02, end (departure from the dispatch point “Arkadia” to the depot) — 19:49.











