Participants and guests of the seventh land auction, who gathered in the assembly hall of the city land resources department on Monday, began with… cleaning their seats. They generously shared wet wipes with each other to wipe the dirty chairs and pointed to the thick layer of dust on the floor. Shortly before the auction, a cleaner with a bucket appeared in the hall. However, only the auctioneer’s podium was wet-cleaned in the presence of guests. After that, he was able to start the bidding.
Initially, eight lots were announced at the auction. Two of them were plots of one and a half hectares at 60 French Boulevard, in the area of the “Rossiya” sanatorium, another two plots, each slightly over one hectare, were on Kovalevsky’s Dacha, near the monastery beach, as well as plots on Tiraspolskoye Highway, 51 Shtilevaya Street, slightly over three hundred square meters at the corner of Pionerskaya and Marshal Govorov streets, and – the perennial lot of all land auctions – a plot in 4th Lokomotivny Lane. They started bidding with it.
Lot No. 1 in 4th Lokomotivny Lane is a plot of 0.4917 hectares, intended for a one- or two-story commercial and warehouse complex. The starting price is 295,020 hryvnias. Due to its remoteness from the city center, it was not in demand at previous auctions. This time, two participants were vying for it, but they did so somewhat reluctantly. Both supported the starting price, but “stumbled” at the next steps of the auction. The auctioneer conscientiously tried to raise the price from 324,523 hryvnias and was still forced to withdraw the object from bidding, promising to put it up later.
And he started bidding on the second lot – a plot at the corner of Pionerskaya and Marshal Govorov streets with a target purpose – for the construction of a single-story cafe for 24 seats. Participants numbered 3 and 4 competed for it. They supported the starting price of 385,416 hryvnias and 50 kopecks, then participant number four supported the next step – up to 462,490 hryvnias and 80 kopecks. The auctioneer’s attempts to raise the price to 501,041 hryvnias and 45 kopecks were in vain: none of the buyers agreed to it. Thus, three and a half hundred square meters in a prestigious area were sold for 462,490 hryvnias and 80 kopecks, at 132,140 hryvnias (or 26.5 thousand conventional units) per hundred square meters.
Since there were not enough applications submitted for the remaining plots to hold an auction, they returned to the plot in 4th Lokomotivny Lane. It was put up for bidding again and sold quite quickly for 354,024 hryvnias. In total, 816,514 hryvnias and 80 kopecks were raised for the two sold plots.
At a small press conference after the auction, the head of the city land resources department, I. S. Kovrizhnykh, stated that this money would go to the repair of communal housing and roads. She did not hide her joy at parting with the “talisman” of all previous auctions – the plot in 4th Lokomotivny Lane. And her joy could not be overshadowed by the usual pickets at building No. 6 on Chernyakhovsky Street. If previously representatives of a public environmental organization stood there with banners, this time citizens calling themselves anarchists walked with slogans on their backs “Auction-scam”. At the same time, for some reason, they did not want to introduce themselves or motivate their civic position.
Journalists eagerly asked I. S. Kovrizhnykh questions about coastal development. One of them was a question about the construction of a 24-story building by city council deputy Vladimir Rondin
at 60 French Boulevard, in the area of the “Rossiya” sanatorium. He acquired the plot of 0.4361 hectares on December 23 at the second land auction. The target purpose was for the construction of a 14-story building. How did 24 floors with parking for 208 cars appear?
“We do not know who and why justified the change in storeys,” replied Irina Savvatyevna. “This is a question for the head of the architecture and urban planning department, Mr. Kolokolnikov. The target purpose of the plot can be changed by the city council session if the deputies consider the owner’s arguments to be valid. As for the coastal development project, the increase in storeys and the placement of underground parking on the seashore, the decision is made by the architecture department.”
Finally, I. S. Kovrizhnykh apologized to those present for the dirty hall. According to her, the department, which trades such expensive goods in Odessa, is experiencing a shortage of cleaners.
Alla KOLESNIK.
Спортивні новини
бокс Чемпіонка! Вже дворазова! Вихованка клубу «Квазар» (тренери — Євген…











