wed, 25 nov --:--:--
USD 0 0
EUR 0 0
А9582.64 ДТ93.04
+17° Одеса

Ми — ваша газета

The current appearance of the central part of Odessa evokes an association from the field of dentistry. Old, dilapidated houses resemble hopelessly sick teeth that are easier to extract than to treat. In the place of the orphaned sockets, enterprising (shrewd, far-sighted, cynical, bold — underline as appropriate) design and construction organizations are erecting modern buildings…
One can argue about the resulting architectural ensemble. One thing is indisputable: in 99 cases out of 100, people living in the houses surrounding a new development find such proximity very uncomfortable, because the treatment of the city center is often carried out without anesthesia, in the “best” traditions of “quack” doctors.


MORE AND MORE Odessans are protesting against their homes being artificially — as a result of nearby construction — turned into dilapidated buildings, with the inevitable subsequent eviction of tenants to far-from-elite “new builds” located on the outskirts of the Kotovsky residential area.
“From the appeal of 129 residents of house No. 29 on Yevreyskaya Street and neighboring houses on Yevreyskaya and Yekaterininskaya streets to the Prosecutor General’s Office of Ukraine:
“Our street is located in the central architectural and historical zone of the city. The two- and three-story houses were built at the end of the 19th century from limestone shell rock using lime mortar. Our houses have a block layout with an inner courtyard.
Since August 2004, the neighboring residential house No. 27 has been vacated and enclosed with a metal fence. At present, its demolition work has been completed.
On the site of this house (the true client is unknown to us, the designer is the firm “Termodom-Yug”), they are planning to erect a seven-story hotel 31 meters high with an underground garage and a technical exit into the inner courtyard of our house, having first destroyed it.
We are categorically against this construction for the following reasons:
— no one asked for our consent, which contradicts the Civil Code of Ukraine and the “Building Regulations of the City of Odessa”;
— the building being erected will entail additional settlement and deformation of the load-bearing structures of the adjacent houses, since their foundations are based on loess collapsible loams;
— our houses have a single-sided orientation of windows, so the building being erected will completely disrupt the insolation of our apartments and worsen sanitary and hygienic living conditions; the distance between the designed hotel building and the outer walls of our houses is from 7 to 10 meters, which contradicts building codes;
— finally, the new high-rise building will violate the architectural and historical ensemble of our street, namely: the complex of the Cathedral Synagogue built in 1846-1853, which is an architectural monument. The erection of a high-rise hotel violates the protected zone of the monument, and it is unknown how it will withstand the impending construction.”
The arguments that the residents of house No. 29 on Yevreyskaya Street set forth in their appeals sent to various authorities are drawn from Technical Report No. 5-3-1-K/04, prepared at the request of the house committee by Candidate of Technical Sciences, Associate Professor of the Odessa State Academy of Civil Engineering and Architecture G. N. Plakhotny (state license AA No. 220499).
This document not only records various violations of building codes and regulations that have already been committed at the initial stage of the hotel’s construction, but also contains a list of recommendations. Thus, “…to ensure favorable insolation, it is recommended to design a building of no more than 3 stories, with a height of no more than 12 meters. It is recommended to immediately reinforce the deformed load-bearing structures of residential house No. 29 and the right wing.”
Additional anxiety for the people was caused by the soothing, vague tone of the responses received from competent authorities: they say, we know about your problems, the design and estimate documentation is in the coordination stage, the GASK inspection has not yet issued a permit for construction and installation work…


“While officials at various levels send us standard form letters, thereby delaying time and the resolution of the issue, the client has already started construction work without the appropriate documents. Failure to comply with the requirements of current legislation will lead to the destruction of our houses and, ultimately, we will all end up on the street,” write the residents of house No. 29 on Yevreyskaya Street to the editorial office.”
People know what they are talking about. When builders dismantled the neighboring house No. 27, preparing the “construction site” for the hotel building, part of the facade wall of house No. 29 was thoroughly destroyed: the attic was broken, heating pipes were exposed, and the outer wall of apartment No. 25 was twisted, where it was necessary to restore the masonry, plaster, and lay tiles from scratch… To be continued?
Oleg SUSLOV.

In the pictures:
On this “patch” — between house No. 29 and the Cathedral Synagogue — it is planned to “plant” a 30-meter hotel.

In apartment No. 25, they have already felt the full “charm” of being neighbors with a new development.
Photo by Oleg VLADIMIRSKY.

Leave a Reply

Your email address will not be published. Required fields are marked *

Загрузка…

Мітки

Наша галерея

Вечірня Одеса