wed, 25 nov --:--:--
USD 0 0
EUR 0 0
А9582.64 ДТ93.04
+17° Одеса

Ми — ваша газета

To ensure the stable operation of the region’s critical infrastructure enterprises during the special period, the acting director of the Department of Life Support Systems and Energy Efficiency of the Odesa Regional Military Administration, Volodymyr Karchy, held an on-site meeting with the management of the “Infoks Vodokanal” branch of “Infoks” LLC.

The main item on the agenda was the preparation of the water utility for the autumn-winter period of 2025/2026. The acting director of the branch, Maksym Zanfirov, and the deputy for technical issues, Oleh Klepatskyi, reported on the progress of the Action Plan for the preparation of the water management complex for the autumn-winter period of 2025/2026.

As part of the preparatory work, preventive maintenance and replacement of water supply networks, equipment checks, and the formation of material reserves and reagent stocks are being carried out.

Volodymyr Karchy focused particular attention on issues of autonomous power supply and readiness for operation during possible emergencies. In this regard, all “Infoks Vodokanal” facilities, where technical possibility and capacity allow, are equipped with generators and a supply of fuel and lubricants.

Leave a Reply

Your email address will not be published. Required fields are marked *

Загрузка…

Мітки

Наша галерея

Вечірня Одеса