Last week, members of the city council reviewed a draft amendment to the detailed development plan for the territory within the boundaries of Stepovaya, Dalnitskaya, Balkovskaya, Babel, and Mikhailovskaya Square streets. The initial version of the detailed development plan was approved back in September 2015. It involved the demolition of three old blocks and the construction of new buildings in their place, including 12-, 16-, and 18-story buildings.
The updated project, prepared by the firm “Master-Group,” was presented by architect Maria Bazan. The amendments provide for the construction of social infrastructure facilities and, as noted by the acting chief architect of the city, Mikhail Shaidneko, do not entail changes in technical and economic indicators, in particular, population density and numbers. The new project provides for sites for two kindergartens for 190 children each, a three-story general education school for 1320 students, and two family medicine outpatient clinics.
The project authors decided to preserve and reconstruct the existing sports school and a three-story building, a cultural heritage site at Stepovaya, 10. Between Mikhailovskaya and Dalnitskaya streets, the project envisages the construction of two centers: an entertainment and a sports center. In addition, the existing fire and rescue station will be preserved. Within the planned territory, all old 1- and 2-story residential buildings are to be demolished, and in their place, 12-, 16-, and 18-story residential buildings with underground parking will be constructed. Only a few old “Stalin-era” apartment buildings will remain. Thus, a new residential microdistrict with a total area of 254 thousand square meters (4200 apartments) will appear in Moldavanka, where 10,000 people will live.
The rapporteur reported that, despite the fact that the main transport load will fall on Balkovskaya Street, the reconstruction of streets with widening of the roadway is planned. Thus, Golovkovskaya Street will become four-lane, Dalnitskaya will be widened to 19 meters, and Stepovaya to 15 meters.
Deputies present at the city council meeting noted that with such a density of development, one school, two kindergartens, and two outpatient clinics are clearly insufficient. Moreover, it is unclear when they will appear, as the development of Moldavanka is already underway – the construction of the “Mikhailovsky” residential complex is currently being completed, but no one is dealing with social infrastructure. Regarding the outpatient clinics, the project author assured that the calculations were made in accordance with the provided standards, which have been confirmed by the city health department: two outpatient clinics will be sufficient for this number of residents.
As noted by Marat Kasimov, Deputy Head of the Department of Architecture and Urban Planning, the detailed development plan (DDP) does not answer the question of who will develop the infrastructure: “This is a question for the city council: how to ensure that the territory develops comprehensively, and not just that houses are built?”
Residents of Moldavanka are concerned about the issue of resettling residents from demolished houses. According to Marat Kasimov, all issues related to demolition and resettlement should be resolved with the investor: “Negotiations on resettlement will have to be conducted with the developer. The task of the city authorities is to help people within the framework of the law and to ensure that the law is not violated.”
As it turned out during the city council meeting, there are catacombs in the planned territory, will they affect the strength of the buildings? The designers noted that the project provides for special work and possible conservation of underground passages for safety purposes.
In general, the draft amendment to the DDP for the development of Moldavanka was approved. Only a few members of the city council abstained, including Pavel Ostapenko, head of the city department for the protection of cultural heritage sites.
Concluding the discussion of the project, Marat Kasimov announced that this DDP has all the approvals and has undergone public hearings. After consideration by the city council’s urban planning council, the document will be reviewed by the city council’s executive committee and then submitted for consideration by the council session. If the deputies support it, it will become an integral part of Odessa’s urban planning documentation.











