Laguna-Reni Company (Odessa region) intends to build a pier for servicing sea tankers at the Reni Sea Commercial Port by 2012. This was announced by the company’s director, Boris Dvorkin, during the LPG Ukraine 2011 conference, as reported by “Ukrainski Novyny”.
According to the company director, the construction of the pier will provide the company with the opportunity to fully utilize the design capacity of its existing liquefied gas transshipment terminal and increase transshipment volumes to 200,000 tons per year. The construction of the pier will allow servicing vessels with a carrying capacity of up to 5,000 tons with a maximum ship draft of 7 meters. The estimated cost of the pier construction is up to $1 million.
In 2011, the company already transshipped 40,000 tons of liquefied gas, while currently it can only service river vessels with a carrying capacity of up to 1,000 tons.
As reported, in 2003, the Reni Sea Commercial Port completed the construction of a liquefied gas transshipment terminal with a capacity of 300,000 tons per year. The investors in the construction were the Ukrainian company “Laguna-Reni” and the Russian “United Oil and Gas Company”. The terminal is designed for the transit of Russian and Ukrainian gas to the Balkan countries. The complex allows for the supply of gas by railway cars and transshipment to trucks and vessels.











