mon, 23 nov --:--:--
USD 0 0
EUR 0 0
А9582.64 ДТ93.04
+17° Одеса

Ми — ваша газета

Work has resumed on the Danube — Black Sea deep-water shipping canal

Dredging works on the Danube — Black Sea canal have been resumed (in the volume of 232 thousand cubic meters). According to preliminary estimates, by the end of December this year — the beginning of January 2006, the navigable draft will be brought to last year’s level — 5 m.
The contractor, based on the results of a tender for the execution of works using state funds, has been determined to be the state enterprise of the Ministry of Transport and Communications system “Ustdunaivodput”.
The revised project materials are expected to be prepared by the design institutes by the end of December this year. By the end of January — the beginning of February, according to the Ministry of Nature, the final conclusions of the environmental and comprehensive state expertise will be received.
After the working project is approved by the Cabinet of Ministers of Ukraine and a stable source of funding is determined, the work on the construction of the Danube — Black Sea deep-water navigation canal will be intensified.

Leave a Reply

Your email address will not be published. Required fields are marked *

Загрузка…

Мітки

Наша галерея

Вечірня Одеса